Bush Hog 2297 manual Operation, Backfilling

Models: 2297

1 98
Download 98 pages 40.4 Kb
Page 74
Image 74
BACKFILLING

OPERATION

OPERATION

BACKFILLING

Approach pile with a level bucket.

Poor methods actually move no more dirt and make it more difficult to hold a level grade.

Do not use bucket in dumped position for bulldozing. This method, shown above, will impose severe shock loadings on dump linkage, bucket cylinder and tractor.

2297 01/11

Operation Section 4-32

© 2011 Alamo Group Inc.

Page 74
Image 74
Bush Hog 2297 manual Operation, Backfilling