OPERATION

OPERATION

BACKFILLING

Approach pile with a level bucket.

Poor methods actually move no more dirt and make it more difficult to hold a level grade.

Do not use bucket in dumped position for bulldozing. This method, shown above, will impose severe shock loadings on dump linkage, bucket cylinder and tractor.

2547 01/11

Operation Section 4-34

© 2011 Alamo Group Inc.

Page 82
Image 82
Bush Hog 2547 manual Backfilling