■INSTALL CHASSIS IN SLEEVE (See Figures 11 to
13)
1.Inspect foam gaskets (top, bottom, both sides) on chassis. Replace foam gaskets if torn or missing.
IMPORTANT: The gaskets combine with the sleeve face to create a weather barrier. If the chassis is installed in a
Chassis weighs up to 150 lb. For personal protection, seek help when lifting the unit. Lift unit by holding unit basepan.
2.If retrofitting into a GE, Amana, Trane, or Friedrich wall sleeve/grille, remove any existing foam seals from competitive manufacturer’s grille before installing unit.
3.Remove shipping tape from vent door. See Figure 11.
Failure to remove shipping tape will prevent fresh air vent door from opening and may result in damage to the vent door cable.
4.Carefully remove power cord packing material and discard.
5.Lift chassis level with wall sleeve.
6.Slide chassis into wall sleeve until foam gaskets rest firmly against front of wall sleeve. See Figure 12.
7.Screw chassis to wall sleeve with four
SIDE | TOP | |
GASKET | GASKET | FOAM SEALS |
BOTTOM | COIL TUBE |
GASKET | SHEETS |
FIGURE 12 — UNIT GASKETS
AND TUBE SHEETS
TOP SCREW HOLE (CARRIER SLEEVE)
COMPETITIVE
MANUFACTURER
SLEEVE
ATTACHMENT
HOLES
BOTTOM SCREW HOLE
(CARRIER SLEEVE)
FIGURE 13 — CHASSIS MOUNTING
VENT | SHIPPING | VENT DOOR |
DOOR | TAPE | CABLE |
FIGURE 11 — LOCATION OF SHIPPING TAPE
ON VENT DOOR
7