A07219
Fig. 14 − Equipment Control Module
5.Match and connect equipment wires to proper terminals of each connector block.
6.Push any excess wire into wall and against Equipment Control Module. Seal hole in wall to prevent air leaks. Leaks can affect operation and cause incorrect temperature and/or humidity measurement.
7.Attach 2−wire pigtail to Equipment Control Module terminal block (terminals V+ and Vg). Attach 2−wire pigtail to the back of the Display Module via 2 pin, keyed connector.
8.Reattach Display Module body to Equipment Control Module by first setting on at top and then push bottom corners to snap into place. See Fig. 15.
22