![FIGURE 3 — MODEL NUMBER NOMENCLATURE](/images/new-backgrounds/52358/523585x1.webp)
52 PE A 3 12 3 0 1 AA
Series Designation
PTAC (Packaged Terminal Air Conditioner)
Comfort Series
CE – Cooling with Electric Heat CQ – Heat Pump
Premier Series PC – Cooling Only
PE – Cooling with Electric Heat PQ – Heat Pump
Latest Revision
A – Z
Electric Heater Size 2 – 2.3 kW
3 – 3.4 kW
5 – 5.0 kW
Cooling Capacity (nominal)
07 – 7,000 Btuh
09 – 9,000 Btuh
12– 12,000 Btuh
15– 15,000 Btuh
Chassis Options
AA – Standard
CP – Corrosion Protection
RC – Wall Thermostat Control (Not available on cooling only units)
RP – Wall Thermostat Control with Corrosion Protection (Not available on cooling only units)
Packaging
1 – Domestic
Changes
Electrical Data
3–
4–
FIGURE 3 — MODEL NUMBER NOMENCLATURE
To install the front panel follow the procedure outlined below:
1.Firmly grasp bottom of front panel on both sides.
2.Hold front panel at a 45 degree angle to unit. Be sure front panel is centered with front of unit.
3.Connect top of front panel to partition rail on top of unit.
4.Gently lower front panel onto chassis, ensuring service cord is positioned through front panel slot.
NOTE: Magnets on bottom of front panel will secure front panel to unit.
To install locking feature on front panel be sure front panel is already installed on unit and follow the steps below:
NOTE: Two
1.Remove both indoor air inlet filters to expose front panel engagement holes. See Figure 4.
2.Secure front panel to chassis by attaching the
3.Replace both indoor air inlet filters.
NOTE: Front panel alignment may have to be adjusted slightly to line with chassis.
TOP PARTITION
DISCHARGE | ENGAGEMENT | FRONT PANEL |
DECK | HOLE | SLOT |
FIGURE 4 — FRONT PANEL INSTALLATION
WITH LOCKING FEATURE