HPK-100 Installation and Operating Instructions

Page 3 of 8

INSTALLATION

Proper installation of the system is essential for years of safe, reliable operation. Please read all instruction before installing the system components. Failure to follow these instructions can cause serious damage to the components or vehicle and may void warranties.

SAFETY PRECAUTIONS

For the safety of the installer, vehicle operator, passengers and the community please observe the following safety precautions. Failure to follow all safety precautions and instructions may result in property damage, injury or death.

Qualifications - The installer must have a firm knowledge of basic electricity, vehicle electrical systems and emergency equipment.

Mounting - Mount the unit for easy access by the vehicle operator. DO NOT mount in air bag deployment area. Assure clearances before drilling in vehicle.

Wiring - Use wiring capable of handling the current required. Make sure all connections are tight. Route wiring to prevent wear, overheating and interference with air bag deployment. Install and check all wiring before connection to vehicle battery.

Testing - Test all horn system functions after installation to assure proper operation. Test vehicle operation to assure no damage to vehicle.

Keep These Instructions - Keep these instructions in the vehicle or other safe place for future reference. Advise the vehicle operator of the location.

UNPACKING

Inspect contents for shipping damage. If found alert carrier immediately. Contact supplier immediately if any components are missing.

Contents of box should include the following items:

Qty

Item

 

1

Amplifier Unit (HA-100-10 14)

 

1

Speaker, 100W 11 ohm (CSP-100B)

 

 

 

 

1

Switch Panel (SP-200)

 

 

 

 

1

Connector, 4-P Terminal Block Plug

(CP4688-04)

 

 

6

Screw, Hex #8 Self Drilling (CP4051-XK-12)

6

Terminal, 3/16” Insulated Fem. Q.C.

(CP4062-K2545)

 

 

1

Instruction Manual (CP5060 This Manual)

CP5060A

02/04/10

Page 3
Image 3
Carson HPK-100 operating instructions Installation, Safety Precautions, Unpacking, Qty