CDA 3L9 manual Installation, Mounting The Extractor

Models: 3L9

1 12
Download 12 pages 3.36 Kb
Page 7
Image 7
Installation

Installation

IMPORTANT:

The extractor is intended to be mounted to the ceiling using fixings appropriate for the ceiling. Ensure that there is adequate ceiling strength and supports at the fixing points; if in doubt, consult a joiner or electrician.

INSTALLATION:

The extractor is intended to be operated as a re-circulation device suspended from the ceiling, as shown in Fig 11.

When installing this appliance over a CDA hob, the clearance between the extractor and the hob must be equal to or exceed 650mm. This instruction overrides the instructions supplied with the CDA hob. (The height should be measured from the top of the hotplates or burners)

Where the extractor is to be installed above a non-CDA hob, the instructions supplied with the hob may dictate that the height required above the hob is greater than 650mm.

IN THE ABSENCE OF ANY INSTRUCTIONS SUPPLIED WITH THE HOB, THE MINIMUM DISTANCE BETWEEN THE HOB AND EXTRACTOR MUST BE AT LEAST 760mm

650mm

Fig. 11

Mounting The Extractor

1.Using the supplied template, mark the positions of the 3 main fixing holes (E) and the 2 additional fixing holes (X) on the ceiling.

2.Drill and plug the holes, as required. If screwing directly to the ceiling joists, plugs may not be required (See Important note above)

3.Insert 3 screws (E) into the main fixings, leaving approximately 3mm protruding, as shown in Fig 12.

min 3mm

 

E

E

 

 

E

E

 

Fig. 12

 

6

Page 7
Image 7
CDA 3L9 manual Installation, Mounting The Extractor