Cecilware 2000 Brewing Instructions Manual Pourover Units, Priming And Brewing Instructions

Models: 2000

1 25
Download 25 pages 6.28 Kb
Page 13
Image 13

MANUAL POUROVER UNITS

THESE INSTRUCTIONS ARE FOR INITIAL PRIMING ONLY AND DO NOT HAVE TO BE REPEATED FOR NORMAL OPERATION.

1.Remove sample filter pack from brew funnel and insert brew funnel back into machine.

2.Place an empty decanter on warmer plate directly under brew funnel.

3. Lift pourover cover and pour 4 decanters of cold water through the top opening at 3 minute intervals. After the third decanter is poured, water will flow through spray head and funnel and fill decanter beneath.

4.Plug line cord into receptacle and turn “ON” (TOGGLE UP) the heater switch, which is located in the back, then turn on the power (and front warmer) switch which is located on the front panel. The power switch light will light, indicating power is being applied to the machine. Wait approximately 15 minutes for the water to reach brewing temperature, at which point the green light comes on. You are ready to brew coffee.

** BREWING INSTRUCTIONS **

MANUAL POUROVER UNITS

After initial priming has been completed

1.Insert brew funnel with filter and grounds into machine.

2.Place an empty decanter on warmer plate directly under brew funnel.

3. Lift pourover cover and pour one decanter of cold water through the top opening, coffee will be ready in 3 1/2 minutes.

4.Remove grounds and filter as soon as coffee has dripped through. Never pour coffee back through spent grounds.

**PRIMING AND BREWING INSTRUCTIONS**

AUTOMATIC GRAVITY FEED

THESE INSTRUCTIONS ARE FOR INITIAL PRIMING ONLY AND DO NOT HAVE TO BE REPEATED FOR NORMAL OPERATION.

1.Remove sample filter pack from brew funnel and insert brew funnel back into machine.

2.Place an empty decanter on warmer plate directly under brew funnel.

3. Plug the power cord into a proper receptacle.

4. Activate the Power Switch. The Green Ready Light will go ON. The tank will start filling. Allow approximately 4-5 minutes for the tank to fill.

5. After the water tank is filled, activate the Heater Switch. Allow approximately 20 minutes for the water to reach a brew temperature (190°F). The heat up time will depend on the water inlet temperature, the input voltage and the wattage of the elements in the machine.

When the (green) Ready Light comes on the machine is ready to start brewing. The machine will only brew coffee after the Ready Light (green) goes ON.

6. Press Brew Button:

** CLEANING INSTRUCTIONS **

Man-page11-14.doc

12

Page 13
Image 13
Cecilware 2000 Brewing Instructions Manual Pourover Units, Priming And Brewing Instructions, Automatic Gravity Feed