Cecilware BC1, BC2 Installation And Operating Instructions, Unpacking And Inspection, Description

Models: BC240 BC120 BC1 BC2 BC301 BC302

1 18
Download 18 pages 56.42 Kb
Page 3
Image 3

INSTALLATION AND OPERATING INSTRUCTIONS

Warranty is void if the Brewer is connected to any Voltage other than the Voltage specified on the data label of the Brewer.

UNPACKING AND INSPECTION

Carefully unpack the Brewer by cutting the straps and lifting the carton off the Brewer.

ASSEMBLY AND SET-UP

The Brewer is shipped complete with:

DESCRIPTION

BC1, 301, 120, 240

BC2, 302

Adjustable legs

4

4

Carriers complete with Faucets and Covers

1

2

Funnels with sample Filter pack

1

2

Remove carriers from Brewer, one has the four (4) legs packed inside. Install legs by tilting Brewer on its back and screwing the legs into the threaded leg supports on bottom.

WATER HOOK UP

The National Sanitation Foundation (NSF) requires the following for NSF approved installation:

1.A quick disconnect water connection or enough extra coiled tubing (at least 2x the depth of the unit) so that the Brewer can be moved for cleaning underneath.

2.An approved flow-back prevention device such as a double check valve to be installed between Brewer and water supply.

WATER CONNECTION

The Brewer comes equipped with a ¼ inch compression water inlet fitting located in the back. Use a ¼ inch copper tubing to connect the Brewer to a cold water supply. Water pressure should be: 20 PSI min. to 90 PSI max. An external shut-off valve and a water filtering system with a charcoal filter are highly recommended.

Turn water supply on and check for leaks at the water inlet connections, tighten compression fitting if necessary.

ELECTRICAL CONNECTIONS

A terminal block inside the base compartment is provided for electrical connections. Opening for field conduit connections are provided in the bottom and the back of the base.

To access the Terminal Block, loosen the 2 screws on the side of the base cover. Disengage base cover from rear panel by lifting base cover up and lifting back towards rear panel.

Power Cord CE202 – Optional ?

 

RECOMMENDED WIRING SIZES

 

Model No.

Single (1) Phase

Single: BC1, BC301, BC120, BC240

12 AWG

Twin: BC2, BC302

10 AWG

Note:

1.Neutral (N) and Ground Wires to be 14 AWG Minimum.

2.Field wiring must be suitable for 75º C.

3.Use Copper wire only for all power supply connections.

3

Page 3
Image 3
Cecilware BC1, BC302 Installation And Operating Instructions, Unpacking And Inspection, Assembly And Set-Up, Description