Cecilware C-2003RG-IT, C-2003G-IT, C-2003LG-IT Installation And Operating Instructions

Models: C-2003LG-IT C-2003RG-IT C-2003G-IT

1 19
Download 19 pages 19.59 Kb
Page 4
Image 4

INSTALLATION AND OPERATING INSTRUCTIONS

Warranty is void if the Brewer is connected to any Voltage other than the Voltage specified on the data label of the Brewer.

UNPACKING AND INSPECTION

Carefully unpack the Brewer by cutting the straps and lifting the carton off the Brewer.

ASSEMBLY AND SET-UP

The Brewer is shipped complete with:

DESCRIPTION

C-2003G-IT

C-2003RG-IT

C-2003LG-IT

Decanters

3

3

3

Funnels with sample Filter pack

1

1

1

WATER HOOK UP

The National Sanitation Foundation (NSF) requires the following for NSF approved installation:

1.A quick disconnect water connection or enough extra coiled tubing (at least 2x the depth of the unit) so that the Brewer can be moved for cleaning underneath.

2.An approved flow-back prevention device such as a double check valve to be installed between Brewer and water supply.

WATER CONNECTION

The Brewer comes equipped with a ¼ inch flare water inlet fitting located in the back. Use a ¼ inch copper tubing to connect the Brewer to a cold water supply. Water pressure should be: 20 PSI min. to 90 PSI max. An external shut-off valve and a water filtering system with a charcoal filter are highly recommended.

Turn water supply on and check for leaks at the water inlet connections, tighten flare fitting if necessary.

ELECTRICAL CONNECTIONS

For standard connections, Plug Power cord into a proper electrical outlet 15A.

4

Page 4
Image 4
Cecilware C-2003RG-IT, C-2003G-IT, C-2003LG-IT specifications Installation And Operating Instructions