Header Wall

Header Bracket

Belt Pulley Bracket

Torsion

Spring

Rail

Garage

Door

Foam Packaging

INSTALLATION STEP 3

Attach the Rail to the Header Bracket

ïPosition the opener on the garage floor below the header bracket. Use packing material as a protective base. NOTE: If the door spring is in the way you’ll need help. Have someone hold the opener securely on a temporary support to allow the rail to clear the spring.

ïPosition the rail bracket against the header bracket.

ïAlign the bracket holes and join with a clevis pin as shown.

ïInsert a ring fastener to secure.

Ring Fastener

Header Bracket

Clevis Pin

5/16"x2-3/4"

Belt Pulley Bracket

Rail

Opener Carton or

Temporary

Support

HARDWARE SHOWN ACTUAL SIZE

Clevis Pin

 

5/16"x2-3/4"

Ring Fastener

11