INSTALLATION STEP 3
Attach the Rail to the Header
Bracket
| • | Position the opener on the garage floor below the |
|
| header bracket. Use packing material as a |
|
| protective base. NOTE: If the door spring is in the |
Header Wall |
| way you’ll need help. Have someone hold the |
| opener securely on a temporary support to allow | |
|
| |
Header Bracket |
| the rail to clear the spring. |
Chain Pulley | • | Position the rail bracket against the header |
Bracket |
| bracket. |
| • | Align the bracket holes and join with a clevis pin |
|
| as shown. |
| • | Insert a ring fastener to secure. |
Rail
Ring Fastener
Header Bracket
Clevis Pin
Chain
Pulley
Bracket
Rail
Garage
Door
Temporary
Support
HARDWARE SHOWN ACTUAL SIZE
Clevis Pin |
|
Ring Fastener |
10