ASSEMBLY |
|
|
|
| |
|
|
|
| To prevent INJURY from pinching, keep hands and | |
1 | Assemble the Rail |
| fingers away from the joints while assembling the rail. | ||
|
|
| |||
| IMPORTANT NOTE: Remove the straight door |
|
| ||
| arm and hanging brackets packaged inside the front rail |
| |||
|
| As a temporary trolley stop, |
|
|
|
|
| insert a screwdriver into the |
|
|
|
|
| hole 10" (25 cm) away from |
|
|
|
Idler |
| the front of the rail, as shown. |
|
|
|
Pulley |
|
|
|
|
|
Hole | A8 | A7 | A7 | A7 | A7 |
Window |
|
|
| KEEP SMALL HOLES ALONG | A13 |
|
|
| OPPOSITE EDGE OF RAILS | ||
|
|
|
| ||
|
|
|
| A8 |
|
B6 Bolt | KEEP |
| |
| LARGER |
| HOLE |
FRONT | ON TOP |
| |
RAIL (TOP) |
|
Trolley |
|
Stop Hole |
|
| A11 |
|
| B6 | Bolt |
|
| FRONT |
|
|
| RAIL |
|
B3 | Lock Nut | Cover |
|
Protection |
| ||
|
|
| |
|
| Bolt Hole |
|
| TO MOTOR UNIT | |
| B3 Lock Nut | |
Front Rail | Back Rails | |
(TO DOOR) | ||
(TO MOTOR UNIT) | ||
|
“U” Bracket
SLIDE RAIL TO STOPS
ON TOP AND SIDES
OF BRACKET
A11 “U” Bracket
ALL HARDWARE SHOWN ACTUAL SIZE
B6 Bolt
B3 Lock Nut
6