ASSEMBLY STEP 2

Fasten the Rail to the Motor Unit

Insert a 1/4"-20x1-3/4 bolt into the cover protection bolt hole on the back end of the rail as shown. Tighten securely with a 1/4"-20 lock nut. Do NOT overtighten.

Remove the two bolts from the top of the motor unit.

Place the “U” bracket, flat side down, on the motor unit and align the bracket holes with the bolt holes. Fasten with the previously removed bolts.

Align the rail assembly with the top of the motor unit. Slide the rail end onto the “U” bracket, all the way to the stops that protrude on the top and sides of the bracket.

CAUTION

To avoid SERIOUS damage to garage door opener, use ONLY those bolts/fasteners mounted in the top of the opener.

ASSEMBLY STEP 3

Install the Idler Pulley

Lay the belt beside the rail, as shown. Grasp the end with the hooked trolley connector and pass approximately 12" (30 cm) of belt through the window. Keep the ribbed side toward the rail, and allow it to hang until Assembly Step 5.

Remove the tape from the idler pulley. The inside center should be pre-greased. If dry, regrease to ensure proper operation.

Place the idler pulley into the window as shown.

Insert the idler bolt from the top through the rail and pulley. Tighten with a 3/8" lock washer and nut underneath the rail until the lock washer is compressed.

Rotate the pulley to be sure it spins freely.

Insert a 1/4"-20x1-3/4 bolt into the trolley stop hole in the front of the rail as shown. Tighten securely with a 1/4"-20 lock nut.

9