Charnwood WOODBURNER Pre Lighting Check, Commissioning, Flue Blanking Plate

Models: WOODBURNER

1 7
Download 7 pages 33.54 Kb
Page 7
Image 7
PRE LIGHTING CHECK

Blanking Plate

Back of the Stove

chimney to be swept through the stove.

Soot doors may either be in the actual brickwork of the chimney or in the register plate. Various positions of soot doors are shown in Figs. 4 to 7.

PRE LIGHTING CHECK

of the stove, light a small fire and check to ensure that smoke and fumes are taken from the appliance up the chimney and emitted safely. Also check all joints and seals.

On completion of the installation and commissioning please leave the operating

Blanking Plate

Clamping Plate

with fold horizontal

 

Clamping plate finishes flush with inside face of firebox top and bottom.

Seal Blanking Plate with fire cement

Fig. 8. Flue Blanking Plate.

Ensure that the throat plate is fitted in the roof of the appliance. The location and positioning of the throat plate is shown in Fig. 2.

Before initial lighting check that the front fence is fitted correctly and that the doors tighten properly.

COMMISSIONING

On completion of the installation and after allowing a suitable period of time for the fire cement and mortar to dry out, make a layer of ash or sand on the base

instructions with the customer and advise them on the use of the appliance.

Page 7

Country 8 &12 WB 6/97

Page 7
Image 7
Charnwood WOODBURNER installation instructions Pre Lighting Check, Commissioning, Flue Blanking Plate