Introduction
Mounting
Ori ent at ion
The
Warnin g
It is important never to obstruct the fan or vents pathway.
∙The installation of the projector has to be built and constructed in a way that it can hold 10 times the weight for 1 hour without any harming deformation.
∙The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net. This secondary safety attachment must be constructed in a way that no part of the installation can fall down if the main attachment fails.
∙When rigging, derigging or servicing the fixture staying in the area below the installation place, on bridges, under high working places and other endangered areas is forbidden.
∙IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including (but not limited to) calculating working load limits, installation material being used, and periodic safety inspection of all installation material and the projector. If you lack these qualifications, do not attempt the installation yourself, but instead use a professional structural rigger. Improper installation can result in bodily injury and or damage to property.
∙The projector should be installed out of the reach of people.
∙When selecting installation location, take into consideration lamp replacement access and routine maintenance.
∙Safety cables should always be used.
∙Never mount in places where the fixture will be exposed to rain, high humidity, extreme temperature changes or restricted ventilation.
∙The fixture must have a minimum of 1 meter from combustible materials.
Mounting Bracket
1 |
2
Safetyseparately!Cable & Clamp sold
3
1. | Clamp |
2. Mounting plate | |
3. | Bracket |
Rigg ing
The
1.Verify the structure can hold 10 times the weight of all
2.From a stable platform, attach two clamps as illustrated on drawing above.
8 |