Chapter 4 Installation on Cisco 3660 Routers
Installing the Ground Lug
Warning Before performing any of the following procedures, ensure that power is removed from the DC circuit. To ensure that all power is OFF, locate the circuit breaker on the panel board that services the DC circuit, switch the circuit breaker to the OFF position, and tape the switch handle of the circuit breaker in the OFF position. To see translations of the warnings that appear in this publication, refer to the Regulatory Compliance and Safety Information document that accompanied this device.
Step 2 Strip one end of the
Step 3 Crimp the ground lug around the wire. (See Figure 4-7.)
Figure
10360
Step 4 Use the number 2 Phillips screwdriver to fasten the ground lug to the Cisco 3660 router chassis. (See Figure
NEBS Level 3 and ETSI Compliance Kit Installation Guide for Cisco 3620, Cisco 3640, and Cisco 3660 Routers
|
| ||
|
|