Cisco Systems 880 Series manual Installing the Power over Ethernet Card

Models: 880 Series

1 12
Download 12 pages 36.35 Kb
Page 7
Image 7
Installing the Power over Ethernet Card

Installing Power Over Ethernet

Step 4 Install the three metal standoffs, provided in the accessory kit, into the three standoff holes, as shown in Figure 5. Use a 1/4-inch nut driver to tighten the standoffs.

Caution Make sure that the standoffs are straight when installed. Tighten them gently but firmly. The shoulder of each standoff must be seated tightly against the system board.

Figure 5

Installing the Power over Ethernet Card

5 Manual background

4

3Manual background

 

 

 

241980

 

1

 

 

 

2

 

 

1

Standoff hole without star pattern

4

PoE card

2

Standoff holes with star pattern

5

Screws

3

Metal standoffs

 

 

Caution When installing the PoE card, ensure that the card is installed in the proper direction. Improper installation will damage the PoE card. Installation of the PoE card requires the installation of three metal standoffs, to which the card is then secured by using three screws. Be sure to use all three screws to ensure that the card is installed properly.

Installing Memory and Power Over Ethernet in Cisco 880 Series Integrated Services Routers

 

OL-16194-01

7

 

 

 

Page 7
Image 7
Cisco Systems 880 Series manual Installing the Power over Ethernet Card