Cisco Systems ME 3400 appendix Preparing for Installation, Connecting to DC Power

Models: ME 3400

1 10
Download 10 pages 3.76 Kb
Page 1
Image 1
A P P E N D I X C

A P P E N D I X C

Connecting to DC Power

To connect the Cisco ME switch to a DC-input power source, follow these steps:

1.Preparing for Installation, page C-1

2.Grounding the Switch, page C-2
3.Wiring the DC-Input Power Source, page C-5

Warning This unit is intended for installation in restricted access areas. A restricted access area can be accessed only through the use of a special tool, lock and key, or other means of security. Statement 1017

Warning Before performing any of the following procedures, ensure that power is removed from the DC circuit. Statement 1003

Caution Installation of the equipment must comply with local and national electrical codes.

Note We recommend that you use 18 AWG copper wiring for Network Equipment Building Systems (NEBS) installation. This guideline follows the standard guidelines for DC power wiring in the Central Office.

Note You can use the grounding lug to attach a wrist strap for ESD protection during servicing.

Preparing for Installation

Locate the DC terminal block plug, the ground lug, and the two number-10-32 screws in the

DC-switch kit.

Obtain these necessary tools and equipment:

Ratcheting torque screwdriver with a Phillips head that exerts up to 15 pound-force inches (lbf-in.) of pressure.

Panduit crimping tool with optional controlled cycle mechanism (model CT-700, CT-720, CT-920, CT-920CH, CT-930, or CT-940CH).

Cisco ME 3400 Ethernet Access Switch Hardware Installation Guide

 

OL-7677-02

C-1

 

Page 1
Image 1
Cisco Systems ME 3400 appendix Preparing for Installation, Connecting to DC Power, A P P E N D I X C