NOTE: If either pushbutton is released BEFORE pressing pressure is applied, head will return to a fully OPEN position.

Pressing pressure will be applied for period of time set. When timer times out, head will automatically open.

NOTE: Head can be opened at any time during timer controlled pressing by pressing OPEN pushbutton (Item 5, Figure 2).

6.Hang or fold pressed article as soon as possible to preserve finish.

Operation

Post-Operating Services

Perform the following services after final operation of day or anytime press is not going to be used for an extended period of time.

1.Close steam supply shut-off valve.

2.Close downstream relieving shut-off valve at air inlet.

3.Close steam return shut-off valve.

4.Clean press head if required. Refer to Maintenance section.

AJ1032

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

11