INSERTCABLE CLIP

Insert plastic cable clip into hole on the back of handle column. Push cables into clip.

Handle Column

Cables

Cable Clip

CONNECT SHIFT ROD

Insert end of shift rod farthest from bend into hole of shift lever indicator.

Insert hairpin clip through hole of shift rod to secure.

Insert other end of shift rod into hole in shift lever.

Insert second hairpin clip through hole of

shift rod with bend of clip on rinht side.

REMOVE TILLER FROM CRATE.

Adjust handle assemby to lowest posi- tion. Be sure lock lever is tightened securely.

Make sure shift lever indicator is in "N" (neutral) position.

Tilt tiller forward by lifting handle.

Separate cardboard cover from leveling shield.

Rotate tiller handle to the dght and pull tiller out of carton.

Attach this end to shift lever

_"_Attach this EndTo shi" _

Shift Rod

Lever indicator

Hairpin Clip Shift Lever

ndicator

Shift Rod

Shift Lever

Shift.od\ Lk

CHECK TIRE PRESSURE

The tires on your unit were overinflated at the factory for shipping purposes. Correct and equal tire pressure is important for best tilling performance.

Reduce tire pressure to 20 PSI.

HANDLE HEIGHT

Handle height may be adjusted to better suit. operator. (See "TO ADJUST HAN- DLE HEIGHT" in the Service and Adjustments section of this manual).

7

Page 7
Image 7
Craftsman 917.29332 owner manual Connect Shift ROD, Remove Tiller from Crate, Check Tire Pressure, Handle Height