WIEDEN MEDIA GAMING TOWER

NOTE: Make sure arrows on each cam points toward nearest edge with holes

A

fixed shelf

bottom panel

left side panel

B right side panel

back panel

5A) Make sure arrows on each cam points toward nearest edge with holes. Fit dowels of left side panel into corresponding holes of back panel and fixed shelf. B) Fit dowels of right side panel into corresponding holes of back panel and fixed shelf. Secure all cams.

6With the assistance of another adult, fit dowels of bottom panel into corresponding holes of left and right side panels as shown. Secure all cams.

B

magnet

shelf pin

C

adjustable shelf

A

top panel

7A) Fit dowels of top panel into corresponding holes of left and right side panel as shown. Secure all cams.

B) Insert 12 shelf pins at desired shelf heights. Press pins firmly to secure.

C) Attach magnet to right side panel with 2 magnet screws, using a screwdriver as shown.

8With the assistance of another adult, position unit upright as shown. Place 3 adjustable shelves onto shelf pins. Make sure shelves are securely supported by each shelf pin.

Made in China - r08

Customer Service 800.967.6696 Latest instructions available at www.crateandbarrel.com

Page 3 of 5