WIEDEN MEDIA GAMING TOWER
NOTE: Make sure arrows on each cam points toward nearest edge with holes
A
fixed shelf
bottom panel
left side panel
B right side panel
back panel
5A) Make sure arrows on each cam points toward nearest edge with holes. Fit dowels of left side panel into corresponding holes of back panel and fixed shelf. B) Fit dowels of right side panel into corresponding holes of back panel and fixed shelf. Secure all cams.
6With the assistance of another adult, fit dowels of bottom panel into corresponding holes of left and right side panels as shown. Secure all cams.
B
magnet
shelf pin
C
adjustable shelf
A
top panel
7A) Fit dowels of top panel into corresponding holes of left and right side panel as shown. Secure all cams.
B) Insert 12 shelf pins at desired shelf heights. Press pins firmly to secure.C) Attach magnet to right side panel with 2 magnet screws, using a screwdriver as shown.
8With the assistance of another adult, position unit upright as shown. Place 3 adjustable shelves onto shelf pins. Make sure shelves are securely supported by each shelf pin.
Made in China - r08 | Customer Service 800.967.6696 Latest instructions available at www.crateandbarrel.com | Page 3 of 5 |