Creda S230G Installation Instructions, Installation And Operational Checks

Models: S230G

1 36
Download 36 pages 38.22 Kb
Page 32
Image 32

INSTALLATION INSTRUCTIONS

INSTALLATION AND OPERATIONAL CHECKS

After installation, check for gas soundness. The supply pressure can be checked at the grill injector. Loosen the fastening screw on the left hand side of the grill burner and slide the burner to the right and then off the injector. Ensure that the grill burner is correctly located and the fixing screw tightened on reassembly.

1.Check that the grill burner ignites correctly and burns with a steady flame. Check for a steady flame on the low setting.

2.Check that, with the main oven set to mark 9, the burner ignites at low rate, and then increases to full rate within 60 seconds. Leave the oven full on with the door closed for 10 minutes, and check that when the control is turned to the ‘S’ setting that the flame reduces.

3.Check that, with the top oven set to mark 8, the burner ignites at low rate, and then increases to full rate within 60 seconds. Leave the oven full on with the door closed for 10 minutes, and check that when the control is turned to mark 1 that the flame reduces.

4.Check the operation of the oven timer, oven light(s) & cooling fan.

Instruct the user on operation of the appliance.

.

32

Page 32
Image 32
Creda S230G installation instructions Installation Instructions, Installation And Operational Checks