DCS C-24 Gas Conversion, Natural Gas Requirements, Lp Gas Requirements, Hook Up

Models: C-24

1 36
Download 36 pages 40.16 Kb
Page 12
Image 12
GAS REQUIREMENTS

GAS REQUIREMENTS

GAS CONVERSION

Verify the type of gas supplied to the location. The wok cooktop is shipped from the factory set up and adjusted for either natural gas or LP gas.

NATURAL GAS REQUIREMENTS:

Connection: 1/2” N.P.T.

Pressure: 6” to 9” Water Column

A manual shut off valve must be installed before the regulator.

LP GAS REQUIREMENTS:

Pressure: 11” to 14” Water Column

A regulator is required at the LP source to provide a maximum of 14” W.C. to the wok cooktop regulator.

HOOK UP:

Make sure the gas supply is turned off at the wall valve before connecting the appliance. All gas supply connections should be made by a qualified technician and in accordance with local codes or ordinances. In the absence of a local code, the installation must conform to the National Fuel Gas Code ANSI 223.1.

Install the 1/2” coupling to the gas inlet at the left rear corner of the unit. Next, install the 1/2” close nipple and regulator (See Fig.11). When installing the regulator, be sure to have the arrow on the regulator body pointing towards the cooktop inlet. Only use sealant which is resistant to the actions of LP gases.

To operate, push and turn the burner control knob to the lite position. The gas flowing to the pilot burner will be ignited by the electric spark igniter. The audible clicking signal is an indication that the igniter is functioning. The appliance is equipped with a safety valve which will take about 30 seconds to heat up before allowing the main burner to come on. Once ignited, rotate the dial to the desired setting.

CAUTION:

The appliance must be isolated from the building’s gas supply piping system by closing its individual manual shut- off valve during any pressure testing of the gas supply piping system at test pressure equal to or less than 1/2 psig (3.5 kPa).

When checking the cooktop manifold gas pressure, the inlet pressure to the regulator should be at least 6.0”W.C. for natural gas or 11.0” for LP.

bottom of unit

Threading compound must be

 

resistant to LP gas

1/2 NPT (supplied with WOK) coupling

3.0” minimum

1/2 NPT (supplied with WOK) closed nipple

Regulator (supplied with WOK) 4.0”W.C.

36” CORD

Metal flexline

Installer supplied shut-off valve must be easily accessible *

*Installation must conform with local codes or with the

National Fuel Gas Code ANSI Z223.1

bottom of unit

LEAK TEST POINTS

Fig. 12

Fig. 11

10

Page 12
Image 12
DCS C-24 installation instructions Gas Conversion, Natural Gas Requirements, Lp Gas Requirements, Hook Up