DCS DRH48N Clearances, SIDE VIEW Four Bolts Per Bracket, Gas Pipe, Surface, Gas Shut-off Valve

Models: DRH48N

1 26
Download 26 pages 24.67 Kb
Page 8
Image 8
Utilize 2 bolts (min) per bracket.

CLEARANCES

00 & 300 INSTALLATION (MINIMUM CLEARANCES TO COMBUSTIBLE MATERIAL).

 

Front View

Wall

Wall

(Combustible

(Combustible

Surface)

Surface)

Heater Mounting

Body Assy.

18"

min

48"

18"

min

00 INSTALLATION (MINIMUM CLEARANCES TO NON-COMBUSTIBLE MATERIAL).

Utilize 2 bolts (min) per bracket.

Make sure heater is level (see warning on page 9)

SIDE VIEW

Four Bolts

Per Bracket

Gas Pipe

Non Combustible

Surface

(installer supplied)

Gas Shut-off

Valve

(installer supplied)

1/2" Conduit

(installer supplied)

Drip Leg

96"

min.

FLOOR

7

Page 8
Image 8
DCS DRH48N Clearances, SIDE VIEW Four Bolts Per Bracket, Gas Pipe, Surface, Gas Shut-off Valve, 1/2 Conduit, Drip Leg