1

Module terminator

2

Ethernet cable connected to Gigabit

 

 

 

Ethernet port

3

Module-to-module cable

4

Power cords

Powering On the Library

1Turn on each power supply’s power switch.

2Turn on the library’s main power using the power button located on the front of the 5U Library Control Module.

The Setup Wizard screen appears on the operator panel when the library has completed its power-on self-test (POST) and initialization. This process takes approximately 30 minutes. Do not power off the library during this process.

Dell PowerVault ML6000 Getting Started Guide

19

Page 19
Image 19
Dell ML6000 manual Powering On the Library