8
FOR YOUR OWN SAFETY, DONOT CONNECTTHE MACHINE TO THE POWER SOURCE UNTIL
THE MACHINE IS COMPLETELYASSEMBLED AND YOU READ AND UNDERSTAND THE ENTIRE
INSTRUCTION MANUAL.
ASSEMBLYCARTON CONTENTS

Fig. 1A Hardware

1. Saw unit
2. Legs
3. Shelf
4. Wheel assembly
5. Stock advance stop
6. Stand handle
7. Vertical table
8. Vise clamping handwheel
9. Floor mounting hardware
10. Pulley
11. Table support bracket
12. Pulley guard
Fig. 1A
Fig. 1B

Fig. 1B Hardware

1. M6x10mm hex head screw
2. 6mm lock washer
3. M6 hex nut
4. 5/16”-18x1”
5. 1/4”-20x1/2”
6. 1/4”-20 hex nut
7. 1/4” flat washer
8. 5/32 hex wrench
9. Cotter pin
10. 5/16” washer
11. 5/16”-18 hex nut
1
2
3
4
5
6
7
8
9
10
11
1
2
3
4
56
7
89
10
11
12

UNPACKING AND CLEANING

Carefully unpack the machine and all loose items from the shipping container(s). Remove the protective coating from
all unpainted surfaces. This coating may be removed with a soft cloth moistened with kerosene (do not use acetone,
gasoline or lacquer thinner for this purpose). After cleaning, cover the unpainted surfaces with a good quality household
floor paste wax.

ASSEMBLY TOOLS REQUIRED

ASSEMBLY TIME ESTIMATE - 1 to 2 hours

* 5/32 hex wrench(supplied)
* 10 mm, 12mm and 1/2inch open end or socket wrenches (not supplied)