35
4
7
8 | 6 |
|
|
|
| 9 |
|
|
|
|
|
|
|
|
|
3. | Dust Intake Port | 7. | Legs (2) | |||
4. | 8. | Bag Retainer Clamp (2) | ||||
5. | 9. | Bag Hanging Rod (2) | ||||
6. |
|
|
|
| ||
|
|
|
|
|
|
|
| 14 |
| 12 |
|
| |
|
|
|
|
| ||
| 11 | 10 |
|
|
| |
|
|
|
|
|
|
| 17 |
| 18 |
| |
| 15 |
|
|
| |
| 16 |
| 13 |
| |
|
|
|
|
|
|
10. | Caster (4) | 13. | 3/8” (9.5mm) Flat Washer for Knobs (4) | ||
11. | Intake Cap and Ring (4) | 14. | 5/16” (8mm) Flat Washers for Casters (16) | ||
12. | Knob for Blower/Motor Assembly (4) | 15. | M4 Sheet Metal Screw for Dust Intake Port (4) |
16.Bracket for
17.5/16” x 3/4”
18.5/16” (8mm) Flat Washer for Bracket (6)
UNPACKING AND CLEANING
Carefully unpack the machine and all loose items from the shipping container(s). Remove the
Do not use highly volatile solvents such as gasoline, naphtha, acetone or lacquer thinner for cleaning your machine.
After cleaning, cover the unpainted surfaces with a good quality household floor paste wax.
7