TABLE OF CONTENTS |
|
Introduction | 4 |
Gerneral information | 4 |
Safety, Signal Words | 5 |
Equipment Safety Guidlines | 6 |
Lighting and Marking | 6 |
Safety Sign Identification and Location | |
Safety Sign Care | 9 |
Tire Safety | 9 |
Remember | 9 |
Before Operation | 10 |
During Operation | |
Following Operation | |
Highway and Transport Operations | |
Performing Maintenance | 13 |
Bolt Torque | 14 |
Axle Installation | 15 |
Wheel Carrier Installation | 16 |
Tongue and Hitch Installation | 17 |
Tank Installation | 17 |
Platform, Step, and Hand Rail Installation | 18 |
19 | |
Truss Boom Installation (28’, 30’, 40’, & 45’) | 20 |
Boom Carrier Installation | 20 |
Safety Stand Installation | 20 |
Manual Control and Panel Mount Installation | 21 |
Hypro Belt Drive Centrifugal Pump Installation and Parts Breakdown | 22 |
Ace Centrifugal Hydraulic Pump Mounting | 23 |
23 | |
Roller Pump Parts Breakdown | 24 |
25 | |
Optional Equipment Mounting Locations | 26 |
HCM Main Parts Breakdown and Parts List | |
Calibration Chart and Instructions | 29 |
Sprayer Checklist and Care | 30 |
Notes | 31 |