35,000, 50,000, And 55,000 Btu/Hr H.S.I. Series

PORTABLE FORCED AIR HEATERS

SERVICE

PROCEDURES

Continued

NOZZLE

1.

Remove upper shell (see page 6).

2.

Remove fan (see page 6).

3.

Remove fuel and air line hoses from

 

nozzle assembly (see Figure 11).

4.

Turn nozzle adapter 1/4 turn to left and

Combustion

Chamber

Nozzle

 

Adaptor

Nozzle

Bracket

 

Adapter

Nozzle Face

Nozzle Seal

Nozzle

Nozzle Adapter

Air Line

Fitting

Fuel Line Fitting

Figure 13 - Nozzle and Nozzle Adapter

 

pull toward motor to remove (see Fig-

 

ure 13).

5.

Place nozzle adapter into vise and

 

lightly tighten.

6.

Carefully unscrew nozzle from the

 

nozzle adapter using 5/8" socket

 

wrench (see Figure 14).

7.

Blow compressed air through face of

 

nozzle. This will free any dirt in

 

nozzle area.

8.

Inspect nozzle seal for damage.

9.

Replace nozzle into nozzle adapter un-

Figure 12 - Removing Nozzle Assembly

PUMP ROTOR

(Procedure if Rotor is Binding)

1.

Remove upper shell (see page 6).

2.

Remove filter end cover screws using

 

5/16" nut-driver.

3.

Remove filter end cover and air filters.

4.

Remove pump plate screws using 5/16"

 

nut-driver.

5.

Remove pump plate.

Insert

Blade

Pump Plate

Air Intake Filter

Filter End

Cover

Rotor

Air Output

Filter

Fan Guard

 

til nozzle seats. Tighten 1/3 turn more

 

using 5/8" socket wrench (40-45 inch-

 

pounds).

10.

Attach nozzle assembly to burner strap.

11. Attach and route fuel and airline hoses

 

to nozzle assembly as shown (see Fig-

 

ure 11). Route photocell wires as shown

 

in Figure 11.

12.

Replace fan (see page 6).

13.

Replace fan guard and upper shell (see

 

page 6).

Combustion

Chamber

Nozzle/

Adapter

Assembly

Photocell

Wires

Air Line Hose

Fuel Line

Hose

Figure 11 - Removing Air and Fuel Line Hoses

6.

Remove rotor, insert, and blades.

7.

Check for debris in pump. If debris is

 

found, blow out with compressed air.

8.

Install insert and rotor.

9.

Check gap on rotor. Adjust to .003"/.004"

 

if needed (see Figure 15).

 

Note: Rotate rotor one full turn to in-

 

sure the gap is .003"/.004" at tightest

 

position. Adjust if needed.

10.

Install blades, pump plate, air filters,

 

and filter end cover.

11.

Replace fan guard and upper shell.

12.

Adjust pump pressure (see Pump Pres-

 

sure Adjustment, page 6).

 

Note: If rotor is still binding, proceed

 

as follows.

13.

Perform steps 1 through 6 above.

14.

Place fine grade sandpaper (600 grit) on

 

flat surface. Sand rotor lightly in “figure

 

8” motion four times (see Figure 16).

15.

Reinstall insert and rotor.

16.

Perform steps 10 through 12 above.

Figure 14 - Rotor Location

Gap Adjusting Screw

.003"/.004" Gap Measured With Feeler Gauge

Rotor

Blade

Gap Adjusting

Screw

Figure 15 - Gap Adjusting Screw Locations

Sandpaper

Figure 16 - Sanding Rotor

8

102388

Page 8
Image 8
Desa and 55 owner manual Nozzle, Pump Rotor, Procedure if Rotor is Binding

and 55 specifications

Desa and 55 are two innovative initiatives that represent the convergence of modern technology and community-focused governance. Both aim to enhance the quality of life for their respective users while promoting sustainable living and effective resource management.

Desa is centered around the concept of "smart villages," where technology is seamlessly integrated into daily life to support sustainable practices. This initiative focuses on empowering rural communities by providing access to modern services and infrastructure through a digital framework. Key features of Desa include smart agriculture, where IoT devices are utilized to monitor soil conditions and optimize water usage, thereby increasing crop yields while minimizing environmental impact. Additionally, Desa promotes renewable energy sources, encouraging communities to harness solar or wind power for local needs and reducing dependence on fossil fuels.

On the other hand, 55 is an urban-centered model aimed at enhancing city living through the use of cutting-edge technologies. It embodies a comprehensive approach to urban planning, integrating smart transportation, waste management, and energy systems. Key characteristics of 55 include a robust public transport system, which employs real-time data analytics to improve efficiency and accessibility. Smart waste management technologies ensure effective recycling processes and decrease landfill usage, thus promoting a circular economy.

Both Desa and 55 prioritize community engagement and participation. They utilize mobile applications and platforms to encourage residents to partake in localized decision-making, ensuring that the systems remain relevant to the unique needs of their users. Data privacy and security are also paramount; both initiatives adopt stringent measures to protect user information while still enabling the benefits of data analysis.

In summary, Desa and 55 represent two distinct but complementary approaches to integrating technology into community living. While Desa focuses on empowering rural areas through sustainable practices, 55 enhances urban life through smart solutions. Their commitment to innovation, community involvement, and sustainability positions both initiatives as leaders in the movement toward smarter, more resilient communities. As global challenges such as climate change and urbanization continue to evolve, models like Desa and 55 will be crucial in shaping a sustainable future.