Contents
ARL LOGO
HIGH PRESSURE PORTABLE FORCED AIR HEATERS
Heater Sizes 350,000 and 600,000 Btu/Hr
Models B350D and B600D
WARNINGS
SAFETY INFORMATION
UNPACKING
PRODUCT IDENTIFICATION
Fresh Air Opening Requirements
THEORY OF
FUELSVENTILATION
OPERATION
TO RESTART HEATER
STORING TRANSPORTING, OR SHIPPING
TO START HEATER
TO STOP HEATER
See Storing, Transporting, or Shipping
PREVENTATIVE MAINTENANCE SCHEDULE
How Often
How To
REMEDY
TROUBLESHOOTING
OBSERVED PROBLEM
POSSIBLE CAUSE
Transporting, or Shipping, page
sure Adjustment, page
Continued
Storing, Transporting, or Shipping
sure Adjustment, page
TROUBLESHOOTING
OBSERVED PROBLEM
sure Adjustment, page
NOZZLE
SERVICE PROCEDURES
UPPER SHELL REMOVAL
SPARK PLUG
SERVICE PROCEDURES
Pump Pressure Adjustment
Procedure if Pump is Binding
PUMP
A. Tank Fuel Filter
Procedure for Tightening Fuel Lines
FUEL LINES
FUEL FILTERS
ACCESSORY
SPECIFICATIONS
WIRING DIAGRAM
MAINTENANCE KITS
350,000 BTU/HR
ILLUSTRATED PARTS BREAKDOWN
PARTS LIST
350,000 BTU/HR
DESCRIPTION
ILLUSTRATED PARTS BREAKDOWN
600,000 BTU/HR
PARTS LIST
600,000 BTU/HR
DESCRIPTION
DESCRIPTION
Figure 18 - Burner Head Assembly
Figure 19 - Motor And Pump Assembly
DESCRIPTION
Page
WARRANTY AND REPAIR SERVICE
LIMITED WARRANTY
PARTS AND SERVICE UNDER WARRANTY
PARTS AND REPAIR SERVICE