VANGUARD 6000 BTU

NATURAL GAS HEATER

INSTALLING TO

LOCATING HEATER

CEILING

WALL

NOTICE: A qualified service per- son must install heater. Follow all local codes.

CHECK GAS TYPE

Use only natural gas. If your gas supply is not natural, do not install heater. Call dealer where you bought heater for proper type heater.

INSTALLATION ITEMS

Before installing heater, make sure you have the items listed below:

piping (check local codes)

sealant (resistant to propane/LP gas)

manual shutoff valve *

ground joint union

test gauge connection * (see Figure 12, page 8)

sediment trap

tee joint

pipe wrench

*An A.G.A. design-certified manual shutoff valve with 1/8" NPT tap is an acceptable alternative to test gauge connection. Pur- chase the optional A.G.A. design-certified manual shutoff valve from your dealer. See Accessory, page 15.

This heater is designed to be mounted on a wall.

WARNING: Maintain the mini- mum clearances shown in Figure

4.If you can, provide greater clear- ances from floor, ceiling, and join- ing wall.

WARNING: Never install the heater

in a recreational vehicle

where curtains, furniture, clothing, or other flammable objects are less than 36 inches from the front, top, or sides of the heater

as a fireplace insert

in high traffic areas

in windy or drafty areas

CAUTION: This heater cre- ates warm air currents. These currents move heat to wall sur- faces next to heater. Installing heater next to vinyl or cloth wall coverings or operating heater where impurities in the air (such as tobacco smoke) exist, may discolor walls.

IMPORTANT: Vent-free heaters add mois- ture to the air. Although this is beneficial, installing heater in rooms without enough ventilation air may cause mildew to form from too much moisture. See Air for Com- bustion and Ventilation, pages 3 through 5.

CAUTION: If you install the heater in a home garage

heater pilot and burner must be at least 18 inches above floor

locate heater where moving ve- hicle will not hit it

For convenience and efficiency, install heater

where there is easy access for opera- tion, inspection, and service

in coldest part of room

 

 

36"

6"

 

Minimum

 

 

Minimum

 

 

From

 

 

Sides Of

 

 

Heater

 

 

 

 

Right

Left

 

Side

Side

 

 

 

 

Minimum To

 

 

3" Top Surface

 

 

Of Carpeting,

 

FLOOR

Tile Or Other

 

Combustible

 

 

 

 

Material

Figure 4 - Mounting Clearances As Viewed From Front of Heater

INSTALLING HEATER TO WALL

Marking Screw Locations

1.Determine where you will locate heater.

WARNING: Maintain minimum clearances shown in Figure 5. If you can, provide greater clear- ances from floor and joining wall.

2.Mark two mounting screw locations on wall (see Figure 5).

 

 

8 7/8"

 

 

7 3/4"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Minimum To

 

 

 

 

 

 

 

 

Maintain 6"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clearance

 

 

 

 

 

 

 

 

From Wall

 

 

 

 

 

 

 

WALL

Mounting

 

 

20 1/4"

JOINING

Screw

 

Minimum To

Locations

 

Maintain 3"

 

 

 

 

 

 

 

 

 

 

 

 

 

Clearance

 

 

 

 

 

 

 

 

From Floor

FLOOR

Figure 5 - Mounting Screw Locations

Continued

6

103113

Page 6
Image 6
Desa BLUE FLAME VENT-FREE NATURAL GAS HEATER installation manual Installing to, Wall