PRE-INSTALLATION PREPARATION

Clearances

Framing and Finishing

5

PRE-INSTALLATION

PREPARATION

Continued

CLEARANCES

Minimum clearances to combustibles for the fireplace are as follows:

*Back and sides

0"/mm

Perpendicular walls

6" (152mm)

Floor

0"/mm

Ceiling to louver opening

42" (1067mm)

Front

36" (914mm)

Top of Standoffs

0"/mm

Vent

(See venting instructions for

 

specific venting clearances.)

Combustible material with a maximum thickness of 5/8" may be flush with the top front of fireplace.

*For back and sides of fireplace, do not pack with insulation or other materials. Zero inch clearance to combustible materials are for framing purpose only.

NOTICE: This fireplace is intended for use as supple- mental heat. Use this fireplace along with your primary heating system. Do not install this fireplace as your primary heat source. If you have a central heating system, you may run system’s circulating blower while using fireplace. This will help circulate the heat throughout the house. In the event of a power outage, you can use this fireplace as a heat source.

FRAMING AND FINISHING

Figure 4 shows typical framing of this fireplace. Figure 5 shows fram- ing for corner installation. All minimum clearances must be met.

36 1/8"

41 1/4"

23 1/2"

For available accessories for this fireplace, see Accessories on page

36.If you are using a separate combustible mantel piece, refer to Figure 6 for proper installation height. You can install noncombus- tible mantels at any height above the fireplace.

Note: Noncombustible mantels may discolor!

15"

10 3/8"

49 5/8"

35 3/4"

13 3/4"

41"

 

41 1/4"

Nailing Tabs

 

68 1/2"

Figure 5 - Framing Clearances for Corner Installation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

Wall

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C

 

 

 

 

 

 

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

D

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Top of Louver Opening

 

 

 

 

 

 

 

 

 

Ref.

Mantel Depth

Ref.

Mantel from Top

 

 

 

 

 

 

 

 

 

 

 

 

 

of Louver Opening

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

14" (356mm)

 

A

 

 

 

16" (406mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

12" (305mm)

 

B

 

 

 

14" (356mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

10" (254mm)

 

C

 

 

 

12" (305mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

8" (203mm)

 

D

 

 

 

10" (254mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

6" (152mm)

 

E

 

 

 

8" (203mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

4" (101mm)

 

F

 

 

 

6" (152mm)

 

 

 

 

7

2" (51mm)

 

G

 

 

 

4" (101mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 6 - Clearances for Combustible Mantels

Figure 4 - Framing Clearances for Installation Against an Exterior Wall

116200-01C

www.desatech.com

Page 5
Image 5
Desa VC36N, VC36P, CGCDV36NR, CGCDV36PR, (V)VC36P installation manual Clearances, Framing and Finishing