VENTING INSTALLATION

Installation for Vertical Termination (Cont.)

17

VENTING INSTALLATION

Continued

6.Continue to add pipe sections until the height of the vent cap meets the minimum building code requirements described in Figure 23 on page 11. Note: You must increase vent height for steep roof pitches. Nearby trees, adjoining rooflines, steep pitched roofs, and other similar factors may cause poor draft or down-drafting in high winds. Increasing the vent height may solve this problem.

7.Twist-lock the vent cap onto the last section of vent pipe and seal outer pipe connection with high temperature silicone seal- ant as specified in the second warning statement on page 12.

Note: If the vent pipe passes through any occupied areas above the first floor, including storage spaces and closets, you must enclose pipe. You may frame and sheetrock the enclosure with standard construction material. Make sure and meet the minimum allowable clearances to combustibles. Do not fill any of the required air spaces with insulation.

Cathedral Ceiling Installation

1.Remove shingles or other roof covering as necessary to cut the rectangular hole for the support box. Mark the outline of the cathedral ceiling support box on the roof sheathing using the locating hole as a center point.

2.Cut the hole 1/8" (3.18 mm) larger than the support box out- line (see Figure 36).

3.Lower the support box through the hole in the roof until the bottom of the box extends at least 2" (5.08 cm) below the ceil- ing (see Figure 36). Align the support box vertically and hori- zontally using a level. Temporarily tack the support box in place through the inside walls and into the roof sheathing.

4.Using tin snips, cut the support box from the top corners down to the roofline and fold the resulting flaps over the roof sheath- ing (see Figure 37). Apply a bead of nonhardening mastic around the top edges of the support box to make a seal between the box and the roof. Nail in place with roofing nails. Remove any com- bustible material that might be inside of the support box.

5.Complete the cathedral ceiling installation by following the same procedures outlined in steps 2 through 7 for Flat Ceiling Instal- lation, starting page 16.

Level

Cathedral Ceiling

Support Box

2" (5.08 cm) minimum below finished ceiling

Cut hole 1/8" (3.18 mm) larger than support box when projected onto roofline

Figure 36 - Cathedral Ceiling Support Box Installation

Nonhardening mastic under all edges of support box before nailing

Figure 37 - Installed Cathedral Ceiling Support Box

Vertical Termination Configurations

Figure 38 through 41 show four different configurations for vertical termination. All connections must be sealed with high temperature silicone sealant as specified in the second warning statement on page 12.

Venting with One 90° Elbow

Vertical (V)

Horizontal (H)

5' min. (1.52 m) 2' max. (0.61 m) 6' min. (1.83 m) 4' max. (1.22 m) 7' min. (2.13 m) 6' max. (1.83 m) 8' min. (2.44 m) 8' max. (2.44 m) 20' max. (6.1 m) 8' max. (2.44 m)

Note: Install restrictor into 4" (10.16 cm) collar of burner system as shown.

Figure 38 - Vertical Venting Configuration Using One 90° Elbow

For morevisit www..com

111739-01A

Page 17
Image 17
Desa CSDBN, CSDPBN Cathedral Ceiling Installation, Vertical Termination Configurations, Venting with One 90 Elbow

CSDBN, CSDPBN specifications

Desa CSDPBN and CSDBN represent cutting-edge advancements in the realm of community-driven development and data-centric governance. These initiatives are designed to empower local communities by integrating technology with robust administration strategies to enhance public service delivery, economic development, and social welfare.

One of the main features of Desa CSDPBN is its focus on participatory governance, allowing community members to actively engage in decision-making processes. This framework encourages transparency and accountability, enabling citizens to voice their needs and priorities while fostering a sense of ownership over local projects. Such involvement helps create tailored solutions that effectively address the specific challenges faced by the community.

Technologically, Desa CSDPBN leverages an array of digital tools that facilitate real-time data collection and analysis. This includes geographic information systems (GIS) and mobile application development to gather insights on resource allocation, infrastructure needs, and demographic information. By employing data analytics, local governments can make informed decisions that enhance resource distribution and service delivery.

The characteristics of CSDPBN and CSDBN systems also extend to their adaptability and scalability. These frameworks are designed to be flexible, allowing them to be replicated across different regions with varying socio-economic contexts. This scalability ensures that diverse communities can benefit from the same foundational principles while customizing aspects to suit their unique environments.

Further enhancing their effectiveness, both initiatives incorporate capacity-building efforts aimed at training local leaders and stakeholders in the use of technology and project management. Such educational components empower communities to sustain development initiatives while fostering local expertise.

Additionally, the integration of social media and online platforms within the Desa CSDPBN framework promotes civic engagement and collaboration among community members. This connectivity nurtures a sense of unity and collective responsibility while improving communication between citizens and local authorities.

Ultimately, Desa CSDPBN and CSDBN embody a holistic approach to community development by harmonizing technology, governance, and citizen participation. They represent a transformative model that not only addresses immediate development needs but also lays the groundwork for sustainable growth and resilience in local communities. As these practices gain traction, they pave the way for a more equitable and inclusive future, where every voice contributes to the narrative of progress.