Desa CSDPBN, CSDBN installation manual Installing Optional Wall Mount Switch GWMS2

Models: CSDBN CSDPBN

1 42
Download 42 pages 2.16 Kb
Page 22
Image 22

22

STOVE AND BURNER SYSTEM INSTALLATION

Checking Gas Connection (Cont.)

Installing Optional Wall Mount Switch - GWMS2

STOVE AND BURNER SYSTEM INSTALLATION

Continued

3.Check all joints from propane/LP supply tank or gas meter to equipment shutoff valve (see Figure 46 for propane/LP or Figure 47 for natural). Apply noncorrosive leak test solution to all gas joints. Bubbles forming show a leak. Correct all leaks at once.

Pressure Testing Burner System Gas Connections

1.

Open equipment shutoff valve (see Figure 45, page 21).

2.

Open propane/LP supply tank valve for propane/LP burner

 

system or main gas valve located on or near gas meter for natu-

 

ral gas burner system.

3.

Make sure control knob of burner system is in the OFF position.

4.

Check all joints from equipment shutoff valve to thermostat

 

gas valve (see Figure 46 for propane/LP or Figure 47 for natu-

 

ral). Apply noncorrosive leak detection solution to all gas joints.

 

Bubbles forming show a leak. Correct all leaks at once.

Control Valve Location

Equipment Shutoff Valve

Gas Meter

5.

Light burner system (see Operating Stove with Burner System,

 

pages 25 through 28). Check all other internal joints for leaks.

6.

Turn off burner system (see To Turn Off Gas to Appliance,

 

page 26).

Figure 47 - Checking Gas Joints for Natural Gas Burner System

INSTALLING OPTIONAL WALL MOUNT SWITCH - GWMS2

Control Valve Location

Equipment

Shutoff Valve

Propane/LP

Supply Tank

1.Connect one terminal of 25 ft. wire for the wall switch to the TPTH terminal on the valve. Connect remaining wire terminal to the TH terminal on the valve. Make sure that the wire termi- nals are in the positions on the unit as pictured in Figure 48. If wires are not connected as shown the switch will not work.

2.Route the 25 ft. wire through openings provided on the sides of the burner system to a convenient location to mount your switch.

3.Connect one bare wire end to each of the terminals of the GWMS2 wall switch.

4.Install the wall switch and cover in the wall.

To Control

Switch or

Optional

Accessory

Figure 46 - Checking Gas Joints for Propane/LP Gas Burner

System

TPTH TP TH

Figure 48 - Control Valve Terminals

For..com

111739-01A

Page 22
Image 22
Desa CSDPBN, CSDBN Installing Optional Wall Mount Switch GWMS2, Pressure Testing Burner System Gas Connections

CSDBN, CSDPBN specifications

Desa CSDPBN and CSDBN represent cutting-edge advancements in the realm of community-driven development and data-centric governance. These initiatives are designed to empower local communities by integrating technology with robust administration strategies to enhance public service delivery, economic development, and social welfare.

One of the main features of Desa CSDPBN is its focus on participatory governance, allowing community members to actively engage in decision-making processes. This framework encourages transparency and accountability, enabling citizens to voice their needs and priorities while fostering a sense of ownership over local projects. Such involvement helps create tailored solutions that effectively address the specific challenges faced by the community.

Technologically, Desa CSDPBN leverages an array of digital tools that facilitate real-time data collection and analysis. This includes geographic information systems (GIS) and mobile application development to gather insights on resource allocation, infrastructure needs, and demographic information. By employing data analytics, local governments can make informed decisions that enhance resource distribution and service delivery.

The characteristics of CSDPBN and CSDBN systems also extend to their adaptability and scalability. These frameworks are designed to be flexible, allowing them to be replicated across different regions with varying socio-economic contexts. This scalability ensures that diverse communities can benefit from the same foundational principles while customizing aspects to suit their unique environments.

Further enhancing their effectiveness, both initiatives incorporate capacity-building efforts aimed at training local leaders and stakeholders in the use of technology and project management. Such educational components empower communities to sustain development initiatives while fostering local expertise.

Additionally, the integration of social media and online platforms within the Desa CSDPBN framework promotes civic engagement and collaboration among community members. This connectivity nurtures a sense of unity and collective responsibility while improving communication between citizens and local authorities.

Ultimately, Desa CSDPBN and CSDBN embody a holistic approach to community development by harmonizing technology, governance, and citizen participation. They represent a transformative model that not only addresses immediate development needs but also lays the groundwork for sustainable growth and resilience in local communities. As these practices gain traction, they pave the way for a more equitable and inclusive future, where every voice contributes to the narrative of progress.