Installation
Continued
| Actual | Framing |
Height | 32 3/8" | 33" |
Front Width | 34 5/16" | 35 1/2" |
Depth | 16 11/16" | 17 3/4" |
1.Frame in rough opening. Use dimensions shown in Figure 13 for the rough opening. If installing in a corner, use dimensions shown in Figure 14 for the rough opening. The height is 33" which is the same as the wall opening above.
2.If using blower, install and properly ground GA3555,
3.Install gas piping to fireplace location. This installation includes an approved flexible gas line (if allowed by local codes) after the equipment shutoff valve. The flexible gas line must be the last item installed on the gas piping. See Installing Gas Piping to Fireplace Location, page 13.
17 3/4"
4.Carefully set fireplace in front of rough opening with back of fireplace inside wall opening.
5.Plug electrical cord into electrical outlet installed in step 2.
6.Carefully insert fireplace into rough opening.
7.Attach flexible gas line to gas supply.
See Connecting Fireplace to Gas Supply, page 15.
8.Attach fireplace to wall studs using nails or wood screws through holes in nailing flange (see Figure 15).
9.Check all gas connections for leaks. See Checking Gas Connections, page 15.
10.Install perimeter trim after final finishing and/or painting of wall (see Figure 7, page 10 ).
Nails or
Wood
Screws
Nailing
Flanges
33" |
|
| Figure 15 - Attaching Fireplace to Wall |
|
| ||
|
| Studs | |
|
|
|
|
35 1/2"
Figure 13 - Rough Opening for Installing
in Wall
393/8"
277/8"
35 1/2" 55 5/8"
Figure 14 - Rough Opening for Installing
in Corner
12 | www.desatech.com |