Desa ROPANE CONSTRUCTION HEATERS owner manual Unpacking Theory Of Operation

Models: ROPANE CONSTRUCTION HEATERS

1 16
Download 16 pages 37.74 Kb
Page 5
Image 5
UNPACKING

UNPACKING

THEORY OF OPERATION

1.Remove all packing items applied to heater for shipment. Keep plastic cover caps (attached to inlet connector and hose/regulator assembly) for storage.

2.Remove all items from carton.

3.Check all items for shipping damage. If heater is damaged, promptly inform dealer where you bought heater.

The Fuel System: The hose/regulator assembly attaches to the propane gas supply. The propane gas moves through the solenoid valve and out the nozzle.

The Air System: The motor turns the fan. The fan pushes air into and around the combustion chamber. This air is heated and provides a stream of clean, hot air.

The Ignition System: The direct spark ignitor (DSI) sends voltage to the spark plug/ignitor. The spark plug/ignitor ignites the fuel and air mixture.

The Safety Control System: This system causes the heater to shut down if the flame goes out.

Combustion

 

Fan

Chamber

 

Nozzle

 

Motor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clean

 

Heated

 

Air Out

 

(Front)

Cool Air In

 

 

(Back)

Spark Plug/Ignitor

 

 

Power

 

 

Cord

 

DSI

Solenoid

 

 

Valve

 

 

 

 

 

 

On/Off Switch

Hose/Regulator

 

 

Assembly

 

 

 

Air For Combustion

 

Fuel

 

And Heating

 

 

 

Figure 3 - Cross Section Operational View (80,000 BTU/Hr Model Shown)

45/80 LP SIDE

LP-PFA/OV 001A

 

Note: Some parts are located differently on some models.

5

099162

Page 5
Image 5
Desa ROPANE CONSTRUCTION HEATERS owner manual Unpacking Theory Of Operation