Desa (V)DVC42(B)(H), (V)DVC36(B)(H) Venting Installation instructions, Continued

Models: (V)DVC36(B)(H) (V)DVC42(B)(H)

1 20
Download 20 pages 2.49 Kb
Page 12
Image 12
HORIZONTAL SYSTEM INSTALLATION
5' min. 6' min. 7' min. 8' min. 20' max.
Vertical (V)

Venting Installation instructions

Continued

HORIZONTAL SYSTEM INSTALLATION

USING TWO 90° ELBOWS

The following configurations show the minimum vertical rise requirements for a horizontal system using two 90° elbows.

45° Elbow

Venting with Two 90° Elbows

 

 

Horizontal (H1) +

Vertical (V)

Horizontal (H1)

Horizontal (H2)

5' min.

2' max.

6' max.

6' min.

4' max.

12' max.

7' min.

6' max.

18' max.

8' min.

8' max.

20' max.

20' max.

8' max.

20' max.

Figure 17 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

Venting with Two 90° Elbows

Horizontal (H1) +

Horizontal (H2)

6' max.

12' max.

18' max.

20' max.45° Elbow 20' max.

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

with Termination at 90° with Fireplace

12

www.desatech.com

118197-01C

Page 12
Image 12
Desa (V)DVC42(B)(H) Venting Installation instructions, Continued, HORIZONTAL SYSTEM INSTALLATION USING TWO 90 ELBOWS