Desa VML27PR installation manual Installing Logs, Pressure Testing Heater Gas Connections

Models: VML27PR

1 28
Download 28 pages 14.4 Kb
Page 13
Image 13

INSTALLATION

Checking Gas Connections (Cont.) Installing Logs

13

INSTALLATION

Continued

4.Check all joints of gas supply piping system. Apply a non- corrosive leak detection fluid to gas joints. Bubbles forming show a leak.

5.Correct all leaks at once.

6.Reconnect heater and equipment shutoff valve to gas supply. Check reconnected fittings for leaks.

Test Pressures Equal To or Less Than 1/2 PSIG (3.5 kPa)

1.Close equipment shutoff valve (see Figure 20).

2.Pressurize supply piping system by either opening propane/LP supply tank valve for propane/LP gas, or opening main gas valve located on or near gas meter for natural gas, or using compressed air.

3.Check all joints from gas meter to equipment shutoff valve for natural gas or propane/LP supply to equipment shutoff valve for propane/LP (see Figures 21 and 22). Apply a noncorrosive leak detection fluid to gas joints. Bubbles forming show a leak.

4.Correct all leaks at once.

Pressure Testing Heater Gas Connections

1.Open equipment shutoff valve (see Figure 20).

2.Open main gas valve located on or near gas meter for natural gas or open propane/LP supply tank valve.

3.Make sure control knob of heater is in the OFF position.

4.Check all joints from equipment shutoff valve to control valve (see Figure 21 or 22). Apply a noncorrosive leak detection fluid to gas joints. Bubbles forming show a leak.

5.Correct all leaks at once.

6.Light heater (see Operating Heater, pages 14 through 17). Check all other internal joints for leaks.

7.Turn off heater (see To Turn Off Gas to Appliance, page 16).

INSTALLING LOGS

WARNING: Failure to position the parts in accor- dance with these diagrams or failure to use only parts specifically approved with this heater may result in

Equipment

Shutoff

Valve

Open

Closed

property damage or personal injury.

CAUTION: After installation and periodically there- after, check to ensure that no flame comes in contact with any log. With the heater set to HI, check to see if flames contact any log. If so, reposition logs accord-

Figure 20 - Equipment Shutoff Valve

Equipment Shutoff Valve

Gas Meter

Control Valve

Location

Figure 21 - Checking Gas Joints for Natural Gas

ing to the log installation instructions in this manual. Flames contacting logs will create soot.

It is very important to install the logs exactly as instructed. Do not modify logs. Only use logs supplied with heater.

1.Place base log (#1) on grate to fit as illustrated in Figure 23. Make sure open areas of log set line up with burner ports (see Figure 24, page 14). Log will fit securely on chassis.

IMPORTANT: Make sure log does not cover any burner ports.

Bottom Log (#1)

Propane/LP Supply Tank

Equipment Shutoff Valve

Control Valve Location

Burner

Grate

Figure 22 - Checking Gas Joints for Propane/LP Gas

Figure 23 - Installing Bottom Log (#1)

For more information, visit www.desatech.com

111115-01D

Page 13
Image 13
Desa VML27PR Installing Logs, Pressure Testing Heater Gas Connections, Property damage or personal injury

VML27PR specifications

Desa VML27PR is a cutting-edge development that represents a significant leap forward in efficient living and sustainable technology. This modern residential complex is designed with both aesthetics and functionality in mind, making it a prime choice for contemporary urban dwellers.

One of the standout features of Desa VML27PR is its commitment to energy efficiency. The buildings are equipped with solar panels that harness renewable energy, significantly reducing reliance on non-renewable power sources. This integration not only lowers utility bills for residents but also contributes to a lower carbon footprint, aligning with global sustainable development goals.

The architecture of Desa VML27PR is marked by its contemporary design, featuring open floor plans and large windows that maximize natural light and ventilation. The use of eco-friendly construction materials further enhances the sustainability aspect, ensuring that the development minimizes its impact on the environment while providing a comfortable living space.

Safety and security are of paramount importance in Desa VML27PR. The complex is equipped with state-of-the-art security systems, including video surveillance and controlled access points, giving residents peace of mind. Additionally, the premises are well-lit and feature landscaped green spaces, promoting a sense of community while ensuring a safe environment for families.

Another significant characteristic of Desa VML27PR is its emphasis on smart technology integration. Homes are equipped with smart appliances and systems that allow residents to control lighting, heating, and security from their mobile devices. This not only enhances convenience but also promotes energy savings by enabling users to monitor and manage their usage effectively.

Desa VML27PR also boasts a variety of communal facilities designed to foster community engagement. These include recreational areas, fitness centers, and coworking spaces that encourage interaction among residents, making it an ideal place for those seeking a vibrant social life.

In conclusion, Desa VML27PR exemplifies the future of urban living, combining sustainability, modern design, advanced technology, and community-focused amenities. It stands as a model for future residential developments, showcasing how contemporary living can harmoniously coexist with environmental responsibility and community engagement. Whether seeking a home for a growing family or a sophisticated living space for professionals, Desa VML27PR is equipped to meet diverse needs, making it a premier choice in today’s real estate market.