![](/images/new-backgrounds/1003254/32549x1.webp)
620515, 620525, 620526, 630515 & 630516 Installation Instructions
| FIG. 4 | 4" |
| 4" |
|
|
|
|
|
| |
|
|
|
|
| |
| REAR | ||||
| OF |
| |||
|
|
|
|
| |
|
|
|
| UNIT | |
|
| Center Line |
|
| |
|
| (±1/8”) OPENING | of Unit |
|
|
|
|
|
|
| |
|
|
|
|
| |
KEEP THESE AREAS |
| 12" |
| ||
FREE OF OBSTRUCTIONS |
|
| |||
|
|
| |||
|
| Air Grill Perimeter |
|
| |
|
| 2" |
|
| |
|
|
|
|
| |
F | 17" |
| R | ||
r |
|
| e | ||
o | (±1/8") | (±1/8") | 3" | a | |
Opening | |||||
n |
| Opening |
|
| r |
| 3" |
|
| ||
t |
|
|
|
|
|
|
| 2" |
|
| |
|
| 17" |
|
| |
|
| Standard | Genesis |
|
|
|
| Grill |
|
|
|
C.Roof Preparation
1.Opening Requirements - Before preparing the ceil- ing opening, the type of system options must be decided upon. Read all of the following instructions before beginning the installation.
If a roof vent opening will not be used a
There may be electrical wiring between the roof and the ceiling. Disconnect 120 volt AC power cord and the positive (+) 12 volt DC ter- minal at the supply battery. Failure to follow this instruction may create a shock hazard causing death or severe personal injury.
The
2.Roof Vent Removal
a.Unscrew and remove the roof vent.
b.Remove all caulking compound around open- ing.
c.Seal all screw holes and seams where the roof gasket is located. Use a good grade of all weather sealant. See FIG. 5.
FIG. 5
d.If the opening exceeds
e.If the opening is less than
3.New Opening- (Installation Other Than Vent Open- ing)
a.Mark a
b.Using the roof opening as a guide, cut the matching hole in the ceiling.
c.The opening created must be framed to provide adequate support and prevent air from being drawn from the roof cavity. Lumber 3/4" or more in thickness must be used. Remember to pro- vide an entrance hole for power supplies, fur- nace wiring and a
connections. |
| |
FIG. 6 |
|
|
Do Not Cut | Good Location- | |
Roof Structure | Supported By | Between Roof |
Or Rafters | CrossBeams | Rafters |
3/4" Min. | Frame Opening So It | |
| Won't Collapse When | |
| Bolting Down Unit | |
Leave Access For Power | 15" Min. At | |
Front Of | ||
Supply Wiring |
| Opening |
CAUTION
It is the responsibility of the installer of this air conditioner system to ensure structural integrity of the RV roof. Never create a low spot on the roof where water will collect. Wa- ter standing around the air conditioner may leak into the interior causing damage to the product and the RV.
5