Installing Projector

Depending on job conditions and projector, it may be easier to remove optional ceiling closure panel before installing projector.

Generally, the video projector should be suspended from the bottom pan according to projector manufacturer’s instructions and recommended standard ceiling mounting hardware. For projectors 10 kgs or below, use Draper's SMS Low Profi le Mount with Universal Projector Bracket.

The Scissor Lift has a grounded 220V AC, 60Hz power cord for projector power supply. The power cord is laced down the back scissor and is “hot” at all times.

Control cables should be laced through our Cable Management System. Make sure to use fl exible cables, and to allow enough cable at each turn so cables do not stretch or kink. This will ensure that cords do not become tangled and damaged during Scissor Lift operation.

Unit and projection system should be operated, checked and adjusted as necessary at this time.

After testing operations, the optional closure panel should be reattached. Be sure to use Loctite®, or other thread locking compound on the nuts.

NOTE: Immediately upon completion of the surrounding ceiling, units should be operated to confi rm that optional ceiling closure panel stops just short of touching ceiling in closed position.

Warning: Keep fi ngers and other objects away from automatic ceiling closure and scissor mechanisms when unit is operating. Serious injury or damage could result.

Some plenum housings are longer than wide and mounting hole locations for plenum will change.

page 2 of 6

Installing Optional Plenum Housing

The Plenum Housing is shipped in pieces, and must be assembled by the installer. The height of the plenum can be adjusted by up to 2" (5 cm) by moving the trim frame to different mounting holes in side panels. It is recommended that an access panel be installed in the ceiling to allow future access.

Attach Plenum frame to top of Scissor Lift.

Install top panel to plenum frame.

Attach assembly to overhead structure. Allow clearance between plenum top and structure for ease of future access.

Install side and end panels, and trim frame.

 

 

Parts List for Scissor Lift Plenum

Item

Quantity

 

Part

 

 

 

 

1

1

 

Plenum Top Frame

 

 

 

 

2

2

 

Plenum End Panel

 

 

 

 

3

2

 

Plenum Side Panel

 

 

 

 

4

1

 

Plenum Top Panel

 

 

 

 

5

varies

 

#10-32 x 3/8" (9.5mm) Hex Head Screw with Zinc Washer

6

varies

 

#8-32 Zinc Keps Lock Nut

 

 

 

 

7

varies

 

½" (8mm)-13 x 3½" (90 mm) Zinc Hex Head Screw

 

 

 

 

8

varies

 

½" (8mm)-13 Zinc Hex Grd 2

 

 

 

 

9

varies

 

3/16"(5 mm) ID x 5"(127mm) OD x 1/16"(3mm) tk Flat Washer

10

varies

 

¼"(6mm)-20 x 1½"(38mm) Zinc Hex Head Screw

 

 

 

 

11

varies

 

¼" (6mm) Flat Zinc Washer

 

 

 

 

12

varies

 

¼"(6mm)-20 Zinc Nylon Insert Lock Nut

 

 

 

 

13

1

 

Trim Frame

 

 

 

 

4

2

Scissor Lift Plenum Housing (Exploded View)

6

3

5

13

7 8

 

Installing Projector 6

1 9

10 11 12

www.draperinc.com page 2 of 6Installing Optional Plenum HousingParts List for Scissor Lift PlenumItemPart10 11 12 (765) 987-7999