Draper LCD Lift Video Projector dimensions Volt Installation/Operating Instructions, Planning

Models: LCD Lift Video Projector

1 4
Download 4 pages 19.78 Kb
Page 1
Image 1
220 Volt Installation/Operating Instructions

220 Volt Installation/Operating Instructions

LCD Lift Video Projector Lift

These Installation/Operating Instructions are available in the official language of the country where you purchase the product. Please contact your distributor to request a copy.

Vous pourriez demander les instructions d’installation et d’opération traduises dans la langue officielle du pays ou vous achetez le produit. Veuillez demander à votre distributeur.

Die Gebrauchsanweisung für Installation und Konstruktion sind in der offiziellen Sprache des Landes, indem Sie das Produkt gekauft haben, vorhanden. Fragen Sie die jeweilige Verkaufs-Abteilung.

LCD Lift Video Projector LiftCaution

Read instructions completely before proceeding.

Follow instructions carefully. Installation contrary to instructions

invalidates warranty.

Do not obstruct operation of doors or universal (fl at) closure with fi ngers

or any object. Serious injury or damage could result.

It is not uncommon to overheat the motor during initial installation when

setting limits. The motor is thermally protected and will stop working temporarily. DO NOT physically pull the unit down when this occurs. Once it has cooled to a safe temperature, it will begin operating again.

LCD Lift is designed to accommodate ceiling suspended equipment. Equipment should not be allowed to rest on doors during operation.

Unit must be installed level (use a carpenter’s level).

Perform Pre-Installation Testing Procedures before beginning installation.

Unit operates on 220-240 V AC current.

Note: Unit has been thoroughly inspected and tested at factory and found to be operating properly prior to shipment.

Planning

Based on screen location and projector specifi cations, determine proper position for projector installation.

Confi rm that there is adequate space available above the ceiling: 49 cm for LCD Lift A; 62 cm for LCD Lift B.

NOTE: Add an additional 2 cm of ceiling space if using ceiling closure panel.

Arrange to provide service access to electrical control box.

Use the switch to move the traveling pan up and down. Removal of the access panel will allow the observation of this movement. The unit will stop automatically when it reaches the fully up or fully down position.

Cycle the unit in both directions until you are satisfi ed the unit is operating properly. If for any reason the unit does not seem to operate properly, call

Draper, Inc. 765/987-7999. Do not proceed with installation.

If the unit has been ordered with the remote control option, again verify operation of the unit by use of the hand held transmitter. If for any reason the unit does not seem to operate properly, call Draper, Inc., 765/987-7999.

Do not proceed with installation.

If the unit is operating satisfactorily, remove and discard the temporary plug.

Disconnect the switch at the terminal board (terminals #1, #3, and #7). Do not discard this switch. It is to be used as the wall switch.

Replace the cover on the electrical box and proceed with the installation, referring to instructions supplied.

Hanging Unit

The LCD Lift may be installed in a variety of ways. Typically, it is recessed above the ceiling and supported by four ½" (12.7 mm) threaded mounting rods. The bottom of the LCD Lift should be recessed approximately 4 cm above the fi nished ceiling. The threaded rods should pass through mounting holes supplied in each corner and be secured by nuts above and below (see Fig. 1). The unit should then be guy wired or blocked to prevent swinging. All installations should observe the following guidelines:

Installer must ensure that all fasteners and supports are of adequate strength to securely support LCD Lift and projector.

Planning Caution: DO NOT hang from, "ride" or pull down on the unit. This could create a failure and cause damage and/or injury.

Fastening methods must be suitable for mounting surface, and anchored so vibrations or abusive pulling will not weaken installation.

Unit should be level, with weight shared more or less equally by all four threaded mounting rods.

Bottom of unit must be unobstructed after installation. 31 cm minimum clearance is required below LCD Lift A; 37 cm below LCD Lift B.

As Soon as LCD Lift Arrives:

Open carton and inspect for damage.

Locate the following parts:

Continued on next page

A. The unit itself

 

B. Bomb bay doors or optional ceiling closure

LCD Lift Dimensions

C. Controls

 

D. Optional SMS Low Profi le Mount with Universal Bracket

 

Follow Pre-Installation Testing Procedure.

Pre-Installation Testing Instructions

 

A

 

 

 

 

 

A

 

 

C

 

 

 

 

C

This LCD Lift was extensively tested and in perfect condition when it left our

 

 

 

 

 

 

plant. To make sure that it arrived in the same condition, please use the following

 

 

 

 

 

 

 

 

procedure to test the unit prior to installation. Draper does not accept back charges

 

 

 

For 12.7 mm threaded rod

 

for labor. Make sure that this unit is operating satisfactorily before installation.

B

D

 

(supplied by others)

 

 

Danger! The traveling pan can exert over 30 kg of force. Do not insert any

 

 

 

 

 

 

 

 

 

 

 

 

 

 

body parts or other objects into this unit while power is connected.

 

 

 

 

 

 

 

 

Remove the unit from the outer carton.

 

 

14.3 mm dia.

 

 

 

 

Remove the cover of the electrical box.

 

 

mounting holes

 

 

 

 

Pre-wire supplied controls and make sure the switch is in the off position

 

 

 

 

 

 

 

 

and plug the unit into a 220V AC outlet. Caution: Do not touch any

 

 

 

 

 

 

 

 

exposed wires while the unit is plugged in.

 

 

 

 

 

 

 

 

Inside the electrical box you will fi nd that a temporary plug has been

 

 

 

 

 

 

 

 

connected to the terminal board. Extend this plug from the box.

 

 

 

 

 

 

 

 

Replace the electrical box cover so that the cover is held loosely (so as not

 

 

 

 

 

 

 

 

to crush the wires) in place.

 

 

 

 

 

 

 

 

 

 

 

Bomb bay door assembly standard.

 

 

 

 

 

Flat ceiling closure panel available.

 

 

 

 

 

A

B

C

D

Travel

Lift

 

 

 

(cm)

(cm) (cm)

(cm)

(cm)

Capacity

 

 

LCD Lift A

60

45

46

28

29

30 kgs

 

 

LCD Lift B

73

57

58

41

42

30 kgs

Figure 1

 

 

 

 

 

 

 

If you encounter difficulties installing or servicing your LCD Lift, call

 

 

 

 

 

 

 

 

 

 

 

 

 

 

your dealer or Draper, Inc., Spiceland, Ind., (765) 987-7999; or fax

 

 

 

 

 

 

 

Copyright © 2008 Draper Inc. Form LCDLift220V_Inst08

Printed in U.S.A.

(765) 987-7142.

Page 1
Image 1
Draper LCD Lift Video Projector dimensions Volt Installation/Operating Instructions, Planning, Hanging Unit, cm cm