Set-up And Delivery Guidelines (cont.)
Getting Ready For Delivery &
• Your 220 Volt spa pack will require a 50 amp dedicated GFCI, load neutral, circuit breaker.
• Extension cords are not to be used in conjunction with operation of the spa. Low voltage damage could result, which is not covered by warranty.
• If you have any doubts, have your electrical system checked by a licensed electrician.
It is the customer’s responsibility to acquire necessary permits and to arrange for installation and hook up of the electrical power by a licensed electrician.
- 9 -