GENERAL PRE-OPERATION INSTRUCTIONS
Priming Pump For Electric Packs
The Power pack system is located under the skirting. The equipment can be serviced by simply removing the door. The door is located on the side of the spa where three panels are located, usually on the side of the spa with the lounger, or the side where the topside control panel is located.
It is important to make sure that all of the air is out of the pump(s) before operating. To do this follow procedures below:
•Turn off power at the breaker
•Make sure the gate valves are open
•Fill the spa with water going thru the filter
•Turn the power on at the breaker
•Start the pump on low speed and water should start circulating within one to two minutes. If water does not start circulating, turn pump from low to high until prime is picked up.
•If pump still does not prime, please see “Trouble Shooting Guide” located in the back of this manual
NOTE!
Note: Equipment style and location will vary by model
124
3 |
| 7 |
| 8 |
5 | 6 |
| ||
|
| |||
1. Ozonator (Optional) |
| 5 | 5. | Gates Valves |
2. LED Controller (Optional | 6 | 6. | Flow Thru Heater | |
3. Auxiliary Pump (Optional) | 7 | 7. | Equipment Pack | |
4. Power Supply (Optional) | 8 | 8. Dual Speed High Performance Pump |
Set thermostat, located on top side control panel, to desired temperature and continue heating until desired temperature has been reached. Depending on equipment, this will normally take 8 to 10 hours.
WARNING!
WARNING: Do not run spa with gate valves closed or run pump with no water circulating in spa for long periods. This could damage the spa equipment.
Dynasty Spas Operator’s Guide • www.dynastyspas.com | 11 |