Before installation

4 01

Inner transit packaging removal

Before installation, check the machine for damage.

A qualified person should always carry out installation. All packaging must be removed before the machine is connected to power or water supplies.

Please retain the transit packaging for future use, as it should be used whenever the machine is relocated.

1Open the outer door and carefully lift out the foam inserts from the front of the inner door.

1

2Take off the rear panel by removing the seven screws,

using a cross-head screwdriver.

3Carefully withdraw the foam block and then refit the rear

panel and screws.

4Remove the two screws from the rear of the lid.

5Remove the lid by sliding it backwards and upwards.

4

5

2

3

7Using the Dyson spanner remove the four bolts securing the top transit bracket.

8Remove the four screws securing the bracket to the machine casing and lift out the transit bracket.

7

6

8

Refit the lid and two screws.

To replace the packaging eg: for moving house, reverse the procedure described above.

Moving the washing machine

• Ensure the feet are screwed into the cabinet before moving the machine. See section 5 03 for instruction on adjusting feet.

To move the machine, pull out the RollerjackTM handle from underneath the machine, which will enable you to manoeuvre the machine easily into your desired position.

Replace the RollerjackTM slowly because the handle may return with force.

NB: The RollerjackTM is designed for final positioning only and not suitable over long distances. Do not push with your foot.

6Remove the plug and cable from the transit bracket from inside the machine.

Page 7
Image 7
Dyson CRO2 manual Before installation, Inner transit packaging removal