8

www.earthquakesound.com

CUSTOM SPEAKER INSTALLATION

GRILLE

 

 

4 SCREWS PER SPEAKER

 

 

 

 

GRILLE TRAY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE:

INSTALLATION APPLIES

TO BOTH COMPONENT

AND COAXIAL SPEAKERS

FACTORY REPLACEMENT INSTALLATION

 

4 SCREWS PER SPEAKER

 

SPEAKER

 

FACTORY CUTOUT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MOUNTING CLIPS

NOTE:

INSTALLATION APPLIES

TO BOTH COMPONENT

AND COAXIAL SPEAKERS

NOTE:

Hand tighten the screws in a crisscross pattern to avoid bending the speaker basket or stripping screws.

Flush Mount Assembly

Flush Mount Complete assembly

Flush Mount Installation

All specifications are subject

Top Ring

Make sure that

the top ring and bottom cup snap when pushed

together

Bottom Cup

Cut diameter: VTEK-25S= 2” (50.8mm)

Push assembled tweeter through cut out hole

Fasten the panel

Panel

clamp down from

 

behind the panel.

Twist on nut

Panel Clamp

until the

 

tweeter is

 

secured

 

to change without notice.

Angle Mount Assembly & Installation

Earthquake has provided two (2) mounting screws to be used in the Angle and Surface options

Top Ring

Mounting screws

Surface Mount Assembly & Installation

Top Ring

Panel

Bottom Cup

Bottom Cup

Panel

9

Page 5
Image 5
Earthquake Sound Focus Custom Speaker Installation, Factory Replacement Installation, Angle Mount Assembly & Installation