Echo ES-250 specifications Shredder Blade, Debris Bag, Maintenance, Level

Models: ES-250

1 36
Download 36 pages 31.36 Kb
Page 26
Image 26
Shredder Blade

MAINTENANCE

ES-250

 

 

1.Start engine, run at idle for one minute.

2.Complete warm up by running at full throttle for 5 minutes, operating choke twice to clear air from carburetor chambers.

3.Check idle speed and reset if necessary. If a tachometer is available, idle speed screw (A) should be set to the specifications found on "Specifications" Page of this manual. Turn idle screw (A) clockwise to increase idle speed; counter clockwise to decrease idle speed.

A

Shredder Blade

Level 1.

Never remove vacuum tube or open fan guard when SHRED ‘N’ VAC® is running or serious personal injury may result. Always wear heavy-duty work gloves when working in shredder blade area.

1.With engine stopped, remove spark plug wire, remove vacuum tube from unit.

2.Remove accumulated debris from blade and inspect for damage.

Do not operate SHRED ‘N’ VAC® if shredder blade is damaged or broken. Return unit to Echo Dealer for service.

3.Install vacuum tube. Refer to “Install Vacuum Tube and Bag Assembly” in assembly section for correct assembly procedures.

Debris Bag

Level 1.

Shake dust from bag and inspect for hole or tears. Inspect zipper and clean debris from teeth to assure complete closing of zipper.

26

X7501182803

© 03/2013 ECHO Inc.

Page 26
Image 26
Echo ES-250 specifications Shredder Blade, Debris Bag, Maintenance, Level