TILLER/CULTIVATOR 11

OPERATOR'S MANUAL

ASSEMBLY

Tools Required: (2) 11mm (7/16in.) Wrenches

1.Support powerhead assembly upright on tines. Place top handle assembly to rear.

2. Loosley assemble lower handles using 6.35 x 76mm (1/4in. x 3in.)

A

B,C

hex head shoulder bolt (A), lockwasher (B), and locknut (C) in

 

 

front handle end mounting hole as shown.

 

 

3.Slide open end of lower handle assembly, front to rear, beneath powerhead and throttle linkage/ignition wires.

4.Place handle tubes into gearcase handle mounting grooves and assemble using 6.35 x 82.5mm (1/4in. x 3-1/4in) hex head shoulder bolt (D), lockwasher (B), and locknut (C) in rear handle mounting

holes. DO NOT TIGHTEN BOLTS.

D

B,C

5.Slide carry handle onto lower handle tubes.

6.Place top handle assembly between lower handles, align mounting

 

holes and install (2) 10 x 30mm carriage bolts (E), (2) lockwashers

F,G

E H

 

(F), and (2) nuts (G). Carriage bolts should be installed from the

 

 

 

 

 

 

outside through the lower handle then upper handle tube.

 

 

 

 

 

 

 

 

 

 

 

7.

Securely tighten lower handle bolts first, then the upper handle

 

 

 

 

 

 

 

 

 

 

 

bolts.

 

 

 

 

 

8.

Secure throttle linkage and stop switch lead midway on right lower

 

 

 

 

 

 

handle with cable tie.