EdgeStar AP410W manual LCDI plug wring instruction, Plug Testing Instructions

Models: AP410W

1 25
Download 25 pages 63.9 Kb
Page 22
Image 22
LCDI plug wring instruction :

LCDI plug wring instruction :

This unit is provided with Leakage Current detection interruption circuit (LCDI )built into the plug of the power supply cord . This device provides protection to reduce the risk of fire due to arcing faults in the power–supply cord. Before use, follow the “Plug Testing Instructions” to ensure that the LCDI circuit is functioning properly:

Plug Testing Instructions:

1.Press Test Button. Unit should trip.

2.Press Reset Button firmly

DO NOT USE IF THE ABOVE TEST FAILS

Do not use the TEST and RESET buttons as an on/off switch. They are only meant to be used to periodically check the LCDI plug

CALL CUSTOMER SERVICE IF TEST FALLS

22

Page 22
Image 22
EdgeStar AP410W manual LCDI plug wring instruction, Plug Testing Instructions

FAQ

What is the LCDI plug wiring instruction for the EdgeStar AP410W Air Conditioner?

The unit is provided with a LCDI circuit built into the power supply cord for fire protection. Follow the Plug Testing Instructions before use to ensure proper function.

How do I test the plug for the EdgeStar AP410W Air Conditioner?

Press the Test Button. The unit should trip. Then press the Reset Button firmly. Do not use the unit if the test fails.

Can I use the TEST and RESET buttons as an on/off switch for the EdgeStar AP410W Air Conditioner?

No, the TEST and RESET buttons are only meant for periodic checks of the LCDI plug. Do not use them as an on/off switch.