Installing and Connecting Up
37
On tiled work surfaces, the joints in the area where the hob sits must
be completely filled with grout.
On natural stone, synthetic stone, or ceramic surfaces, the snap-
action springs can be bonded in place.
Ensure that the seal is correctly seated in the frame and that it is
seated against the work surface without leaving any gaps. Please do
not apply additional silicon sealant, this will make removal more dif-
ficult in the event of the need for service.
min.
5 mm
min.
25 mm